Project Info
Seacroft Holiday Park required an update and refurbishment to 3 key areas within the main building at the holiday park. This included the reception area and access to it, toilet area and facilities and the main ballroom.
These areas within the holiday park were closed from the visitors for a short period of time to complete the work within a 6 week period. This means that between ourselves and the subcontractors that had been appointed directly by the client, the works needed to be programmed and managed as efficiently as possible.
The existing reception and entrance to the holiday park were re-configured to create a new welcome environment at the site. A new main doorway was formed and re-located to the side of the entrance block. This allowed for a new ramped access to be installed which subsequently created a better use of space within the front lobby.
The Ladies WC were relocated to a nearby office. This required an alteration to the mains drainage pipework, new water feeds and additional radiator system to be extended to an area that previously only had an electric supply. The existing ladies toilet were stripped back and converted into a new gents toilet area.