Wentworth Green - Norwich

Refurbishment of main bathroom, master bedroom en-suite and new kitchen installation.


Brief:

Refurbishment of main bathroom, master bedroom en-suite and new kitchen installation.

What we did:

Over a period of two years The Construction Co were contracted to various projects by the client. The first being a full refurbishment of bathroom & ensuite incorporating structural alterations all carried out to a local bathroom companies design. This followed with a similar size project carried out all enabling works for a kitchen refurbishment incorporating a new underfloor heating system. In addition to these projects we have also gradually refurbished the entire house internally and re landscaped the rear patio.

Key Points:

  • 7 Week Project (in 2 phases) 2 large projects
  • Kitchen, Bathroom, internal decs and landscaping Refurbishment
  • Installation of bathroom design & supplied by Mags
  • Working alongside client’s kitchen contractor
  • Testimonial

    What this client had to say...

    Jean Parker

    Jason and his guys carried out several major projects on my house over a 2.5 year period. Everything was finished to a high standard and any small changes I wanted were carried out without fuss. A great bunch of guys.